Advisory · 11 May 2026 · 10:30am Woollahra Library · Vietnam in 7 days · 3 material events 7–10 May ↓
Level 0
1 The Map 2 Money 3 GTM 4 Product 5 People 6 Asks
01
Chapter 1
The Map
15 min · Week in review · The four problems · Kai counter-evidence · Governance timeline
SECTION 01

Week in review · 4–11 May

  • Sun 3 May
    Machine sync + pipeline prep for May 4
  • Mon 4 May
    Martin advisory session · 99 min · Partner crisis named · Vietnam May 18 locked in
  • Mon 4 May
    Spike Analysis launched · Hugh (Tranda) requests 2-pager for ADAD pitch · PMF signal
  • Mon 4 May
    Standup AM · Vincent 1:1 · Albert starts (ML engineer, €60K/yr)
  • Tue 5 May
    Brain refresh · Fathom pipeline fixed · fathom-transcript-puller task created · advisory deck built
  • Wed 6 May
    Spike 2-pager to Hugh (Tranda) · Matt + Barton copy review
  • Wed 6–Fri 8 May
    SVP + Sheet Society demo prep · May 8 offshore payroll (first stress test)
  • Wed 13 May
    Brand identity Workshop #3 (concept lock pending)
  • Sun 18 May
    Vietnam meeting · binary decision · full 6-month commitment OR separation

Delivered this week

  • Vietnam May 18 locked in (circuit breaker finally acted on)
  • Spike Analysis launched May 4
  • ADAD pitch 2-pager request received (Hugh/Tranda)
  • Fathom transcript pipeline fixed end-to-end
  • All brain files updated, advisory deck built

Still open / due

  • Spike 2-pager to Hugh by Wed 6 May
  • Tom (Supermetrics) approach not yet made
  • SVP + Sheet Society demos not yet scheduled
  • Nicole (Nova): 2 articles + next meeting not sent
  • Comp agreement still unsigned
  • Dan commission: 0 leads, still on zero-cost
SECTION 02

The four compounding problems · unchanged

Problem 1
Sales · velocity too low
Q2 pipeline $197k ARR vs $250k target. SVP/Sheet Society/Nova are the make-or-break deals. Tom (Supermetrics) commission approach is the best new lever. Dan: 0 leads sustained.
Problem 2
Product · delivery gate blocked
Matt (Adrenalin) denied UAT access to Spike — Elisa perfectionism. MMM at B+ (Kai's impact). Spike launched but key user not embedded. AI assistant, customer emails, notifications: 12+ months unshipped.
Problem 3
Delivery · fragile at current volume
Global Rescue pilot week 5/8 — highest priority. Adrenalin (Spike) second. Coffee Club deprioritised (non-payment). ROLI paused £15K AR outstanding. Elisa controls delivery gating.
Problem 4
People · governance breach
Albert hire: Elisa + Vincent voted against Michael's explicit financial warning. Partners demanding bank access + higher pay. Vietnam May 18 is the forcing function. No forming agreement was ever made.

The new compounding layer

The partner governance breach is now compounding all four problems. Until Vietnam resolves the commitment question, it is difficult to drive delivery (Elisa controls product gate), sales (Elisa co-leads demos), and finance (partners controlling spend via Albert hire). Vietnam is not just a "trust circuit breaker" — it is the unlock condition for the other three problems.

Counter-evidence: Kai

Kai (recent hire under product) drove MMM Dashboard from D- to B+ in weeks. This is direct counter-evidence to the "12-months-no-output" narrative. The right reading: it's not that Seeda can't ship — it's that Elisa's gate slows everyone except Kai who works around it. If Kai can ship at this pace, why can't Elisa's broader function? This is a Vietnam question.
SECTION 03

Where the founder's time went · May 4–11

Above the line · customer-facing
  • Martin advisory session (99 min)
  • Vincent 1:1 (partner relationship)
  • Spike Analysis launch coordination
  • Spike 2-pager for Hugh/ADAD (due Wed)
Below the line · operational
  • Fathom transcript pipeline fix
  • Brain files refresh + advisory deck build
  • Queue CSV maintenance + Chrome fix
  • Vietnam agenda prep (this week)
"The gap is not incidental. The gap is the cause." Seeda canonical frame · Apr 20 · still true

Note: this week's above-the-line work included the Martin session and Vietnam prep — crisis management, not pure customer acquisition. The gap between customer-facing time and operational time remains structural. Target: 3+ customer conversations this week before Vietnam.

SECTION 04

The governance crisis · how we got here

  • Jan 2024
    Elisa + Vincent join as co-founders. No formal forming meeting. No decision-rights framework agreed. Gap created
  • Feb–Apr 2026
    Michael injects A$86K+ personal cash into Seeda operating account to cover losses. Partners are not aware of the full picture. Transparency gap
  • Apr 13, 2026
    Martin: "Hope is not a strategy." Circuit breaker prescription. Michael defers Vietnam.
  • Apr 16, 2026
    Leadership meeting: Albert hire raised. Michael warns the business cannot afford it. Motion deferred.
  • Late Apr, 2026
    Elisa + Vincent vote to hire Albert (ML engineer, €60K/yr). Cited "moral obligation" — he had left a full-time job. Michael's warning overridden. Authority breach
  • Apr 2026
    Partners demand: full financial transparency (bank accounts + Xero access) AND higher pay. Michael reads this as "buyer's remorse."
  • May 4, 2026
    Martin session: "You didn't have a forming meeting when you all said, okay, let's do it with these two guys, did you?" Vietnam May 18 locked in. Binary decision
  • May 11, 2026
    TODAY: agenda + success criteria for May 18 agreed with Martin
  • May 18, 2026
    Vietnam · binary decision: full 6-month commitment to 12 clients, OR separation
"Do you shut up the shop?" Martin Rippon · May 4 · forcing Michael to name the binary
02
Chapter 2
Money
20 min · P&L crisis (reconciled) · Cash · Q2 weighted forecast · 12-client math
SECTION 05

May P&L · the crisis numbers

April loss (actual)
-A$7K
May forecast
-A$15K+
Runway
3–6 mo
Albert added cost
~A$6K/mo
DriverMonthly impactNotes
Albert ML engineer (EUR)-A$6,000+€60K/yr. Voted in by Elisa + Vincent against Michael's warning. Starts May 4.
Base burn (ex-Albert)-A$7,000Apr actual. P&L burn rate ~A$8,700/mo YTD.
Rimon R&D rebate (inflow)+A$50KFY25 rebate expected May–Jun. One-time. Not recurring.
Recurring MRR~A$24–25K/moKleva DRTV+Dashboard + INSP + GR + ShipBob + TCC (if paying)

Michael has personally funded this business · the math

A$86K injected Feb–Apr 2026 via 12 "personal loan" transfers (~A$28K/mo from Michael). Operating revenue covered ~A$12K/mo. Combined ~A$40K/mo of total outflow. The P&L shows -A$8.7K/mo because revenue is amortising (unearned income coming down) — but the cash reality is harsher: Michael has been the lender of last resort at ~A$28K/mo for 3 months running.
ScenarioBurn/moCash A$40KRunway
If Michael stops injections, no SVP/SS~A$15K (P&L + Albert)~2.7 months
Mid: SVP closes, Michael holds~A$8K~5 months
Both close, Rimon arrives~A$0 (breakeven)Indefinite
SECTION 06

Cash position · Apr 26 snapshot

CommBank operating
A$39,966
Director's Loan (Seeda owes Michael)
A$717,758
Equity (accumulated losses)
-A$824K
Inflow (next 60 days)AmountConfidence
Rimon FY25 R&D rebate~A$50,000Expected May–Jun
Kleva DRTV + DashboardA$6,985/moHigh
Inspirations Paint~A$7,800/moHigh
Global Rescue~A$6,500/moHigh
GST refund~A$11,917Q4 BAS lodgement
Outflow (next 60 days)AmountTiming
Payroll May 8 offshore~A$15–18KFirst stress test
Payroll May 25 leadership~A$14–15KRecurring
PAYGW remitA$55,509May (Michael)
Super remitA$25,563Jaime auto-debit pending
SECTION 07

Q2 pipeline · probability-weighted forecast vs $250K target

Q2 target (ARR)
A$250K
Weighted forecast
A$197K
Unweighted ceiling
A$289K
DealGross ARR (A$)ProbabilityWeightedStatus
SVP Worldwide~A$85K70%A$60K90-day eval; demo env risk
Sheet SocietyA$119K60%A$71KAUD lock expired; Bed Threads clone needed
Nova Entertainment~A$85K30%A$26KArticles + meeting pending
Other (small/long-tail)A$50K40% blendedA$20KReachOut, partner spike deals
Risk: existing churn (Kleva, ROLI, TCC)--A$20KCoffee Club non-pay; Kleva risk
Net probability-weighted Q2~A$157K + A$40K AR retention = ~A$197K

Reading the math honestly

The A$53K gap exists because we are weighting deals at 60–70%, not 100%. SVP at 70% reflects the demo-env risk and 90-day eval framing. Sheet Society at 60% reflects the AUD lock having expired May 1. The realistic upside is A$220–240K if Q2 execution is clean. The realistic downside is A$140K if either SVP or Sheet Society slips a quarter. Michael needs to decide: do we tell partners the weighted forecast or the unweighted ceiling at Vietnam? Different number, different conversation.
SECTION 08

What does "12 clients in 6 months" actually mean?

Martin's framing: full 6-month commitment to reach 12 clients = business viable. But this number has never been math-tested in any session. Let's test it.

ScenarioAvg ARPC (A$/mo)12 clients MRRAnnualisedBurn covered?
Low mix (small Spike + Dashboard only)A$3,500A$42K/moA$504K/yrYes, but thin
Current mix (avg of GR/INSP/Kleva)A$6,500A$78K/moA$936K/yrHealthy
High mix (SVP/Sheet Society size)A$9,000A$108K/moA$1.3M/yrStrong · plan target met

The honest read

"12 clients" is meaningless without an ARPC assumption. With current 5 paying customers averaging ~A$5K/mo, going to 12 at the same blended ARPC delivers ~A$60K/mo MRR (A$720K/yr). That covers full team comp + reasonable burn but does not fund growth. The number that matters is not "12 clients" — it's "are we adding 7 net-new at A$5K+ ARPC in 6 months?"

The acquisition rate that's required

7 new clients in 6 months = 1.17 net new/month. Q1 actual: +1 net new (Global Rescue). Q4 2025 actual: 0 net new. The required pace is 5–10× the actual pace of the last 6 months. Without a real change in acquisition velocity (Tom + agency partners + Michael's calendar shift), 12 clients in 6 months is a hope, not a plan. This is what Vietnam needs to commit to changing.
03
Chapter 3
GTM
15 min · Q2 close plan · Tom (Supermetrics) · Spike ADAD signal
SECTION 09

Q2 close plan · three deals, seven days

DealNext actionOwnerRisk
SVP Worldwide Elisa co-lead exec demo. Ensure demo env looks better than last time. Michael + Elisa Demo env needs polish
Sheet Society Clone/anonymize Bed Threads demo. Co-lead with Elisa. Joel Goodsir reference call available. Michael + Elisa AUD lock expired May 1
Nova Entertainment Send 2 articles to Nicole Bence. Request next meeting. Michael Low urgency vs above two

Elisa as co-lead · why this matters

Making Elisa a co-lead on SVP + Sheet Society directly addresses Martin's Apr 13 question about collective ownership of the sales process. Deals become a shared win, not "Michael's dodgy deal." It also gives Elisa skin in Q2 performance at exactly the moment we're asking for partner commitment at Vietnam.
SECTION 10

Tom (ex-Supermetrics) · commission-only approach

Contact
Tom (ex-Supermetrics)
Leads available
1,000
Upfront cost
A$0

Tom is an ex-Supermetrics rep with an existing list of 1,000 Supermetrics leads — these are performance marketers already buying data tools, ideal Seeda ICP. Commission-only means zero fixed cost, which matters given the current burn rate. Leverages the trusted relationship Michael already has with Tom.

Status

Approach not yet made as at May 5. Michael to reach out this week. This is a two-week unlock for pipeline without a full-time hire, at the exact moment we need sales momentum before Vietnam.
SECTION 11

Spike Analysis · the ADAD PMF signal

Launch date
May 4, 2026
ADAD signal
Top growth agency
Matt UAT access
DENIED
Hugh (Tranda) requested a 2-pager for a pitch to ADAD — a top growth agency — for a product that is not yet fully built. May 4 session · PMF signal definition: "people pitch products that don't exist yet"
SignalWhat it means
ADAD pitch requestTop growth agency already wants to sell Spike to clients. This is external validation from a credible market participant.
2-pager requested by Hugh/TrandaMichael to send by Wednesday May 6. Matt + Barton to review copy/positioning.
Matt (Adrenalin) denied UATThe key reference user for Spike had no test access before launch. This is a process failure — Elisa's perfectionism drove the decision. Fix this week.
SECTION 12

Broader pipeline posture

SegmentStatusAction
hipagesLost to MutinexClosed. Lesson: category competitor. Mutinex won on speed + leadership push.
ReachOutQualified, nurtureSocial Impact manager timing the gate. Chase by end of week if silent.
Dan commission0 leadsZero-cost contract. Floor or exit decision overdue. Can't stay in limbo through Vietnam.
ROLI £15K ARPausedWrite-off or chase? Bring with finance refresh.
Coffee ClubNon-paymentDeprioritised. Collections action needed before June.
04
Chapter 4
Product
15 min · MMM B+ · Spike launched · delivery gate problem
SECTION 13

MMM Dashboard · B+ and climbing

Quality grade
B+
Driver
Kai hire
GR pilot
Week 5 of 8
CustomerStatusNext action
Global Rescue #1 priorityPilot week 5/8. Highly engaged. Strong UI feedback.Continue. Leverage engagement for case study.
Adrenalin #2 prioritySpike focus. MMM in background.Get Matt UAT access to Spike ASAP.
Inspirations Paint #3 priorityActive, 12-mo contract.Use improved MMM (B+) for re-engagement. Slingshot data refresh.
Coffee Club DeprioritisedNon-payment.Collections before June or pause service.
SECTION 14

Spike Analysis · launched, but key user locked out

Working

  • Product launched May 4
  • Hugh/Tranda ADAD pitch request = PMF signal
  • 2-pager in progress (Matt + Barton reviewing)
  • Kleva DRTV channel proving the concept

Not working

  • Matt (Adrenalin) denied UAT access before launch
  • Key reference user had no hands-on time before May 4
  • Elisa perfectionism driving gate decisions unilaterally
  • ADAD pitch requires complete product — not fully built yet

The UAT failure is a governance signal, not just a process miss

Who decides when a customer gets product access? Right now that decision sits with Elisa. If the answer after Vietnam is "Elisa continues to control this gate," then Matt's UAT miss will repeat. This needs to be on the Vietnam agenda as a decision-rights question.
SECTION 15

The 12-month delivery gap

From the canonical frame: Elisa has shipped zero customer-facing features in 12 months. The features that matter most to customers — email notifications, chatbot, self-serve onboarding, UAT pipeline — remain unbuilt.

The product showcase for Martin and the wider team has not yet been scheduled — it's an action item from May 4 that Michael needs to follow up with Elisa. May 4 action item #1 · timestamp 2:06
FeatureStatusCustomer impact
Customer email notifications12+ months unshippedKleva cited as gap before Pro Plan pause
Self-serve onboarding12+ months unshippedBlocks scaling to 12 clients without delivery cost explosion
Spike Analysis (DRTV)Launched May 4Strong PMF signal. UAT access still an issue.
AI AssistantIn developmentRoadmap item. Priority vs. above two unclear.
05
Chapter 5
People
25 min · Governance breach · Partner demands · Decision-rights framework · Plan C · CPO rethink · Cultural lens
MATERIAL EVENTS · 7–10 MAY

What changed since this deck was last built (6 May)

Sub-L1 content — these events were private to Michael + Elisa + Vincent and did not appear in the L1 leadership deck. Martin sees them via L0 cascade. Three events with direct Vietnam relevance.

Sub-L1 · 8 May · Michael + Elisa (Vincent joined) EFFECTIVE TODAY

Sophia + Anne now report directly to Michael · Elisa exits client management

In a 98-minute 3-way call on May 8, Michael, Elisa, and Vincent agreed: 90% of Sophia's interactions will go through Michael. Elisa retains a 10% product coordination role (daily stand-up, human relationship only). Elisa steps completely out of client management — no customer interface, no delivery oversight. Decision was framed as "Elisa cannot do both product and client management." Vincent agreed in the call.

Vietnam implication: The CPO rethink (Ask 2 below) has been partially resolved — Elisa's scope is already being narrowed. Vietnam is no longer about "wrong people in roles" as an abstract question; it is about whether the narrowed scope is sustainable at current comp.
Michael's lean: The restructure was the right call and happened with full partner consent. The question for Martin: does this change what a "yes" looks like at Vietnam — is it commitment in the new roles or commitment to the old scope?
Sub-L1 · 8 May · Comp dispute crystallized

Elisa named three paths · ~$17K AUD retroactive gap claimed · deferred to Vietnam

Elisa believes her contract (10% revenue bonus, never formally replaced) creates a ~$17K AUD retroactive gap Jan–May 2026. Michael's position: Jan 2026 budget replaced the revenue bonus with salary growth tied to revenue milestones. Neither view is settled in writing.

Path AHonour contract · pay the ~$17K gap
Path BAlternative comp for the gap (equity, deferred, other)
Path CReduce scope to part-time (~$3K USD/mo)

Michael committed: send financial clarity by Wed 20 May (post-Vietnam). Ask for Martin: which of A/B/C does Martin think is the most defensible frame given the Vietnam outcome? If partners commit (yes), Path A or B. If not (separation), Path C or mutual release.

Pipeline · 8 May · #1 deal MEETING TODAY 3PM AEST

Rip Curl (KMD Brands) now #1 deal · Amy Stewart GM eCommerce · meeting 4.5 hrs after this session

Amy Stewart (GM eCommerce, KMD Brands — parent of Rip Curl, Kathmandu, Oboz) accepted a meeting for Mon 11 May 3:00pm AEST. Two paths: AUD 25K pilot (current FY close) or AUD 100K full retainer (FY27). This is Michael's most immediate above-the-line commercial opportunity and lands on the same day as this advisory session.

Context for Martin: Michael will need to be fully present and sharp for a CEO-level commercial conversation at 3pm. This session should end with Michael clear on his top 2–3 conversation points for Amy — ICP fit (omni-retail, offline TV + digital), Kleva DRTV proof point (closest comparable), and the pilot structure.
SECTION 16

The governance breach · what happened and why it matters

The Albert hire vote

Michael warned the team the business could not afford a new hire. Elisa and Vincent voted to hire ML engineer Albert (€60K/yr, starting May 4) anyway, citing a "moral obligation" — he had left a full-time job to join. The effect: May loss forecast doubles from -A$7K to -A$15K+. Michael's financial authority was overridden by majority vote. There was never a founding agreement that defined how financial decisions are made.
Martin's question
"You didn't have a forming meeting when you all said, okay, let's do it with these two guys, did you?"
The implication
Without a forming agreement, there is no agreed decision-rights framework. The Albert vote is its first visible consequence — and it won't be the last.
The Michael factor
Michael has personally injected A$86K+ into the business since Feb 2026 to cover losses. This is the context for the partner demands for transparency and higher pay.
SECTION 17

Partner demands · the pre-Vietnam posture

DemandMichael's readPlanned response
Bank account accessBuyer's remorse. Trust crisis driven by visible losses.Share Jan 25+ cash flow proactively before May 18.
Xero accessReasonable given the financial deterioration — they have a right to understand the state.Present 18-month financial view as part of Vietnam prep.
Higher payTiming is the problem. Business is losing A$15K+/mo. Paying more now = shorter runway.Tie to Vietnam outcome. Pay increase tied to commitment + 12-client plan.
Comp agreement signedFramework drafted, not signed. Has been pending since April 13 prescription.Decision: sign before Vietnam (reduces negotiating lever) or defer to Vietnam outcome?
"Are you prepared to take a candle that we're actually going to crack the code over the next six months?" Martin Rippon · May 4 · the question for Elisa and Vincent
SECTION 17B

The forming agreement we never had · proposed framework

If Vietnam produces a "yes," it must include a written decision-rights framework. Without one, the next Albert-style override happens in 60 days. Proposed structure for Martin to react to:

Decision classThresholdWho decidesOverride
Hires > A$2K/mo costAnyCEO (Michael)CEO veto absolute
Hires < A$2K/mo costAnyFunctional leadCEO informed, no veto
Customer pricing > A$10K commitmentAnyJoint (CEO + product lead)CEO veto on commercial terms
Product roadmap priorityQuarterlyJoint (CEO + product lead)CEO veto if cash < 3mo runway
Bank account / Xero accessRead-onlyGranted to all 3 partnersNo veto · transparency unconditional
Bank account write accessAnyCEO + bookkeeper onlyCEO sole signatory
Comp changes (own salary)AnyJoint board agreementTied to milestones, not requests

The principle

Transparency = unconditional. Authority = conditional and tiered. Partners get to SEE everything (defuses the secrecy accusation). Partners do NOT get to override financial decisions above a threshold (prevents another Albert hire). This is the trade Michael offers in exchange for the 6-month commitment.
SECTION 17D · ADDED 6 MAY

The CPO question · wrong people in product seats?

Michael asked Elisa to be CPO with Vincent's support. Both are data scientists, deep in marketing measurement. The general product-leadership role keeps surfacing as the problem — and the same problem keeps showing up in different sections of this deck.

Surfacing asSectionCommon root
12 months no customer features shippedS15Product direction unclear
Matt (Adrenalin) denied UAT — Elisa perfectionismS14CX gating decisions sit with wrong owner
ADAD pitch on a not-fully-built productS11Product polish lagging market signal
PMF gap (5 customers, none "love us")S02Customer-happiness function under-owned
Albert ML hire (more data science capacity)S04, S16Adding to the strength, not the gap

The reframe

The Vietnam binary as currently framed is "are you in or out for 6 months?" The CPO-rethink reframe is: "are you in for 6 months in your real roles?" Hire an experienced product designer + customer-experience professional to own product direction and customer-happiness. Return Elisa + Vincent fully to marketing measurement and data science — what they actually excel at. The Albert hire then makes more sense (it strengthens their function, not the gap).

The trade-off to surface at Vietnam

A product/CX hire adds ~A$8–15K/mo at exactly the moment we're firefighting -A$15K/mo May losses. The trade: better product + retained partners + clearer roles vs more burn. With SVP + Sheet Society pipeline at A$197K weighted Q2, the additional cost can be absorbed if both close. Without those closes, this is unaffordable. So the CPO hire and the Q2 pipeline outcome are linked — they sequence together.

The risk

Elisa may read "you're not the CPO" as demotion rather than realignment, even when paired with explicit data-science ownership. How this is framed at Vietnam matters as much as the substance. (See S17E for cultural lens on this.)
SECTION 17E · ADDED 6 MAY

Cultural ownership lens · Irish/UK vs Parisian on public mistakes

Michael's instinct on partner accountability comes from an Irish/UK register: name the mistake publicly, own it publicly, that is how trust gets rebuilt. Vincent (French/Parisian) operates in a different register where public mistake-acknowledgment carries more weight, more risk to standing, more shame.

Behaviour observedRead 1: governance failureRead 2: cultural register mismatch
Albert hire override against Michael's warningAuthority breach"Moral obligation" framing protects standing publicly
Vincent secrecy accusations (April 8, 10pm)Trust deficitPre-emptive defence to avoid being publicly wrong-footed
Dismissal of Michael's weekend builds as "demoralising"Engagement gapPublic criticism easier than private acknowledgment
Resistance to bank/Xero transparency"Buyer's remorse"Public visibility of partner financial position is uncomfortable

If Read 2 is operative — implications for Vietnam agenda

The current Vietnam agenda (S21) has a "Their turn · Elisa + Vincent respond" block with everyone in the room (1:30–2:15). In the cultural-mismatch frame, that's a public-acknowledgment moment that may not land. Alternative: private 1:1s with each partner first (Michael + Elisa, then Michael + Vincent), then convene as a group to lock the decision. Same outcome. Different route. More likely to produce a real "yes" rather than a saved-face "yes."

What this is NOT

This is not Michael excusing partner behaviour or rationalising the governance breach. The Albert override is a real authority breach regardless of cultural lens. But how it's addressed at Vietnam may benefit from a frame that protects partner standing publicly while being binding privately — that's what the decision-rights framework (S17B) does, and the agenda design can reinforce it.
SECTION 17C

Plan C · what does separation actually look like?

Martin asked on May 4: "What do you do without a lease from Vincent?" If Vietnam produces a "no" — or a fake yes — Michael needs a documented plan, not an emotional response. Sketch:

Asset / functionCurrent stateWithout Elisa + Vincent
Vietnam team (offshore eng)Vincent runs day-to-day; Anh managesHigh risk · Anh + Kai become primary; need transition plan
VN office leaseVincent signatoryNeed separation · either Vincent retains lease + sub-contracts team, or Seeda re-papers
Product gate / deliveryElisa controlsRe-org · Kai + Peter step up; Michael owns delivery cadence
Customer relationshipsMostly Michael; some Elisa (Kleva, INSP)Manageable · 90% Michael-fronted already
Equity / cap table3-way split (uncatalogued)Legal · need clean buyout / share repurchase plan
Albert (just-hired ML eng)Reports to VincentDecision needed · keep + reassign, or part ways immediately

The blunt assessment

Separation is operationally feasible — Michael fronts most customer work, Kai + Anh + Peter can absorb delivery, IP/ownership is clear. The risk is in two places: (1) the Vietnam team transition (Vincent personally holds key relationships there), and (2) the cap table cleanup (no forming agreement = messier separation paperwork). Michael needs to walk into Vietnam with this plan known but unstated — confidence that there is a Plan C is what makes a real "yes" possible.
06
Chapter 6
Asks
45 min · Open items · 7 decision-forcing asks · Vietnam agenda draft · Pre-Vietnam checklist
SECTION 18

Open items · status as at 11 May

#ItemPriorityStatus
1R&D tax rebate (Rimon)PassiveExpected May–Jun. ~A$50K inflow. Process passive.
2Vietnam May 18 · binary decisionUrgentLOCKED IN. Agenda structure to agree today.
4Written comp agreement (Elisa + Vincent)Urgent8 May update: Elisa named 3 paths (A: pay gap, B: alt comp, C: reduce scope). Comp deferred to Vietnam outcome. See material events block above.
5Dan commission decisionHigh0 leads sustained. Floor or exit — decision overdue.
7Tom (Supermetrics) commission-only approachHighNot yet made as at May 10. Outreach must happen this week.
9Albert hire governance breachUrgentMust surface at Vietnam without becoming blame conversation.
10Partner financial demands (bank + Xero)UrgentNot yet done. Must send Jan 25+ cash flow before May 18. Tuesday May 12 is the window.
11Spike 2-pager to Hugh (Tranda)Overdue Wed 6Status unconfirmed as at May 10. Confirm with Michael: sent or not?
12SVP + Sheet Society demosHigh8 May update: Elisa exits client management effective today. Demo co-lead model may need to be revisited. Michael likely solo on these now.
13Vietnam agenda documentDue todayDraft + agree structure + success criteria with Martin at this session.
NEWRip Curl (KMD Brands) · #1 deal · meeting today 3pmTodayAmy Stewart (GM eCommerce) meeting at 3pm AEST. AUD 25K pilot or AUD 100K FY27 retainer. 4.5hrs after this session.
SECTION 19

Decisions from May 4 · retrospective

#DecisionMartin's inputStatus
1Vietnam May 18 · binary decision meetingShaped the binary: full 6-month commitment to 12 clients OR separationLocked in
2Tom (ex-Supermetrics) commission-only approachPursue lowest-cost path to pipelineNot yet made
3Michael + Elisa co-lead SVP + Sheet Society demosFix the sales undervaluation theme — Elisa as co-ownerCo-lead model revised · May 8: Elisa exits client management. Demo structure may revert to Michael solo. Demos still unscheduled.
4Client priority locked: GR #1, Adrenalin #2, INSP/TCC #3Agreed prioritisationAgreed
5Spike 2-pager to Hugh by Wed + Matt + Barton copy reviewAct fast on PMF signalIn progress
6Share Jan 25+ cash flow + 18-month financials with partnersProactive transparency defuses secrecy accusationNot yet done
May 8 sub-L1 decision (not in May 4 log): Sophia + Anne moved to report directly to Michael. Elisa exits client management completely. Agreed 3-way (Michael + Elisa + Vincent) in 98-min call. Effective today. This is the structural decision that landed.

Pattern from the decisions log

Structural decisions from Martin's sessions land (Vietnam locked in, client priority set, and now the client management restructure made on May 8). Behavioural + operational decisions lag (Tom not approached, financials not shared, demos unscheduled). The pattern is consistent across three consecutive sessions.
Ask 1 of 5 · Strategic · 12 min · LEAVE WITH A DECISION

Vietnam structure · which of these four agenda shapes do we use?

This is not a discussion. By the end of this ask, Michael leaves with one chosen agenda shape and Martin's reasoning. The agenda draft (S22) is then edited to match.

(a) Money first Open with full financial reality (cash, runway, A$86K injection). Force partners to react. Then ask the commitment question with the numbers in their hands.
(b) Commitment first Open with "I need to know if you are in for 6 months." Get a position before the numbers. Then walk through finance after.
(c) Story-arc Walk back to the forming-meeting gap. Frame Albert as symptom, not cause. End on the forward proposal (decision-rights framework + 6-month plan).
(d) Split-room Michael + Martin frame for 30 min. Then Michael leaves the room for 1 hour. Elisa + Vincent decide privately. Reconvene to hear their answer.
Ask 2 of 7 · UPDATED 10 MAY · HIGH PRIORITY · 8 min

CPO role rethink — wrong people in product seats?

10 May update: The client management dimension of this question was resolved on May 8 — Elisa has stepped out of client management, effective today. The remaining open question is specifically about product leadership: is Elisa (data scientist) the right owner for product direction, or should Seeda hire an experienced product designer + CX professional? The Vietnam frame has shifted: not "wrong roles" broadly, but "wrong product owner specifically."

The pattern surfaces in S02, S11, S14, S15, S17D: data scientists asked to drive general product/CX, product/CX keeps coming up short. Michael's lean is to hire an experienced product designer + CX professional, return Elisa + Vincent to pure data science. Now that the client management piece is settled, this ask is purely about the product ownership question.

(a) Reframe validity Is the role-fit lens a clean way to address the partner crisis without forcing a full break, or is Michael avoiding the harder commitment question?
(b) Vietnam sequencing Bring the product/CX hire proposal to Vietnam as part of the package, or hold in reserve depending on the partner response in the room?
(c) Cost vs benefit Adds ~A$8–15K/mo at peak burn. Closeable only if SVP + Sheet Society both sign Q2. Worth the trade?
(d) Demotion risk Elisa may read this as demotion regardless of how it's framed. How does Martin recommend introducing it without that read landing?
Ask 3 of 7 · NEW · 6 min

Cultural ownership lens — Irish/UK vs Parisian on public mistakes

Michael's instinct on partner accountability is Irish/UK: name + own publicly. Vincent's register may be Parisian: public ownership carries more shame, more risk to standing. Some of what we read as governance failure (Albert override, secrecy accusations, transparency resistance) may be cultural register mismatch. See S17E for the matrix.

(a) Frame validity Does Martin agree the cultural lens is operative here, or is Michael being too generous?
(b) Agenda design If yes — does the Vietnam "Their turn" block (1:30–2:15) need to become private 1:1s before group convene?
(c) Language Is there language Michael should/shouldn't use in the room that lands harder or softer in a French context?
(d) Binding-but-private Should the comp/decision-rights framework have a non-public version that protects partner standing while still being binding?
Ask 4 · 4 min · BINARY
Partner financials: share Jan 25+ cash flow before May 18, or in the May 18 room?
Michael's lean: BEFORE. Pre-empts the "secrecy" accusation, gives partners 5 days to absorb the numbers, removes emotional shock from the Vietnam room. Martin: confirm or counter, then we send Tuesday May 12.
Ask 5 · 4 min · BINARY
Albert: do we name the override directly in Vietnam, or let the decision-rights framework speak for itself?
Michael's lean: name it directly. Without naming it, the framework reads as Michael being controlling. Naming it as "the moment that proved we needed this" turns it from blame into evidence. Martin: confirm framing or propose alternative.
Ask 6 · 4 min · BINARY
Comp agreement: sign before May 18, or make it a Vietnam outcome?
Michael's lean: make it a Vietnam outcome. Signing before reduces the negotiating lever and rewards partners before they've committed. After Vietnam yes-vote, comp is signed within 48 hours. Martin: confirm or counter.
Ask 7 · 4 min · BINARY
Spike UAT / Matt: fix this week as one-off, or take it into Vietnam as a delivery-governance question?
Michael's lean: both. Get Matt access this week (immediate). Use the UAT failure as a concrete example in Vietnam of why the decision-rights framework matters. Martin: agree, or argue for keeping it tactical only.
Time discipline · 45 min total for asks. Ask 1 (Vietnam structure) is the deep one (12 min) because it sets the agenda shape. Asks 2–3 (CPO rethink + cultural lens) are NEW high-priority items added 6 May (8 + 6 min) because they may reshape the Vietnam approach itself. Asks 4–7 are 4 min each — Michael states the lean, Martin agrees or pushes, decision recorded. If Martin wants to discuss longer than 4 min on any of 4–7, that's a signal we have the wrong frame.
SECTION 21

Vietnam agenda draft v0 · Martin edits this live in the room

This is the deliverable Michael takes into Vietnam on May 18. Martin's job today is to edit, reorder, or rewrite this. Print this page and mark it up.

Vietnam · 18 May 2026 · 3-hour session

Attendees: Michael, Elisa, Vincent (Martin remote dial-in optional)
Goal: Binary commitment to a 6-month plan with documented decision rights, OR clean separation.
What Michael walks out with: A signed page with each partner's name, "yes/no," and date.

TimeBlockOwner
0:00–0:15Frame. Why we're here. The Albert hire surfaced a gap we never closed. Today fixes it or ends it.Michael
0:15–0:45Reality. Walk through Jan 25+ cash flow. A$86K personal injection. May -A$15K+. The next 12 months requires either commitment + structure or a clean exit.Michael (numbers pre-shared May 12)
0:45–1:15Proposal. The 6-month plan: 12 clients, decision-rights framework, transparency-unconditional + authority-tiered. What Michael commits to. What partners commit to.Michael
1:15–1:30Break · 15 min · everyone steps outside.
1:30–2:15Their turn. Elisa + Vincent respond. What's missing. What they need. What they will NOT accept.Elisa + Vincent (Michael listens)
2:15–2:45Negotiate or decide. Either we agree on amendments, or we acknowledge we're not aligned.All three
2:45–3:00Sign or part. Each partner names their position in writing on a single page. No soft "we'll think about it." A written yes/no with date.All three

The success criterion (Martin verbatim · May 4)

"What would success look like for you coming out of the Vietnam meeting?"
Michael's draft answer: A signed page with each partner's name and either "I commit to the 6-month plan as written" or "I am exiting." No third option. No soft maybe. The fake yes is the failure mode — a written commitment removes that option.
SECTION 22

Between today and Vietnam · Michael's 7-day execution checklist

DayActionOwner / dependency
Mon 11 May (today)10:30am: Finalise Vietnam agenda + decision-rights framework with Martin (this session)
3:00pm: Rip Curl (KMD Brands) — Amy Stewart · #1 deal · AUD 25K pilot or AUD 100K FY27 — above-the-line commercial conversation immediately after this session
Martin's edits at 10:30am · Amy Stewart at 3pm
Tue 12 MaySend Jan 25+ cash flow + 18-month financial view to Elisa + Vincent (no commentary, just numbers + 1-page narrative)Michael (Adeel + Ibrahim verify)
Tue 12 MayReach out to Tom (ex-Supermetrics) re commission-only roleMichael
Wed 13 MayBrand identity Workshop #3 (Elisa + Vincent in person · pulse-check on engagement)Michael + Jason + Martin
Wed 13 MaySpike 2-pager confirmed sent to Hugh (Tranda); Matt + Barton review completeMichael (already due Wed 6)
Thu 14 MaySVP exec demo (demo env polished) · Note: Elisa exits client management effective 11 May — confirm whether Michael leads solo or Elisa still co-presentsMichael (Elisa participation TBC)
Fri 15 MaySheet Society demo (Bed Threads anonymised clone)Michael (Elisa participation TBC)
Fri 15 MayPrint + finalise Vietnam agenda + 6-month plan + decision-rights framework (one binder Michael flies with)Michael
Sat 16 MayTravel to VietnamMichael
Sun 17 MayFinal pre-meeting call with Martin (confirm framing, last-minute adjustments)Michael + Martin
Mon 18 MayVietnam · 3-hour session · binary outcome documentedAll three partners
The discipline test: If by Wed 13 May any of: Tom not contacted, financials not sent, demo env not polished — those are signals Michael is reverting to "below the line" execution while Vietnam looms. Martin: please call this directly if it happens, including via Slack DM.